Dam Building
![](https://www.weatheralldockanddredge.com/wp-content/uploads/2022/05/dam_original_enhanced.jpg)
Weatherall Dock & Dredge Inc. completed this dam that connected two rivers with a road allowance in between. The dam was engineered, formed and cast in place, and then had a concrete facade placed on top for the final finished appearance.
![Dam Building](https://www.weatheralldockanddredge.com/wp-content/uploads/2022/04/dam.jpg)
Weatherall Dock & Dredge Inc. completed this dam that connected two rivers with a road allowance in between. The dam was engineered, formed and cast in place, and then had a concrete facade placed on top for the final finished appearance.
![Dam Building](https://www.weatheralldockanddredge.com/wp-content/uploads/2022/04/dam2.jpg)
This photo above shows the finished dam. The area has been filled with water and the customer can use the dam area as a seating area.